Walk Through Esper Refit - Oyster435
Esper Refit 01 - introduction to our extensive yacht refit
Esper Refit 09 - Awlgrip 545; Redesigning Cabin; Polyurethaning The Veneer
Esper Refit 10-11 - Q&A; Limewashing; Teak Floor
Esper Refit 30 - LED strip lights; mast blockage removal
Esper Refit 22 - Waldringfield Boatyard Special; decks complete
Esper Refit 24 - unique saloon table in teak; rubbing strake
Esper Refit 17 - Stainless work; faring deck; preparing hull
Esper Refit 41-42 - welding rodents; Rocna bow roller
Esper Refit 32 - invisible stainless welds; how to plug deck fittings
Esper Refit 03a - Six Days Work In A Boatyard In Three Minutes
Esper Refit 46 - Christmas Special
Esper Refit 39 - Totem crew take over; life in the boatyard
Esper Refit 05 - Etch Priming; Building Boxes; Forestay Woes
Esper Refit 02a - Removing The Main And Mizzen Mast From An Oyster 435 In Thailand
Esper Refit 19 - Awlcraft Topcoat On Topsides
Esper Refit 53-55 - launch day - drone footage; Dripless seal issues
Esper Refit 02 - mast removal; rewiring plans; stripping engine
Esper Refit 26-29 six month round-Up
Esper Refit 21 - Awlcraft Top Coat