VLOG 94, Narrowboat fit out - Exhaust, Fittings and Pipe prep on Canaline 42 Engine
Time to line duck hatches and doors | Our Narrowboat Fit out | EP94
VLOG 96, Narrowboat Fit Out - HATCH FRAMES
VLOG 91, Narrowboat Fit Out - New engine bed
VLOG 50, Narrowboat Fit Out - HOT WATER, PAINT & A LITTLE LIFT
VLOG 93, Narrowboat Fit Out - We have an engine, Canaline 42, Part 1
VLOG 95, Narrowboat Fit Out - Fuel lines, Hoses and Cables on Canaline 42 Engine - PART 3
VLOG 101, Narrowboat Fit Out - Inverter, Travel Pack and a lot more wiring PART 3
VLOG 86, Narrowboat Fit Out - Bilge pump pipework and finish painting cabin sides
VLOG 75, Narrowboat Fit Out - WORKTOPS
VLOG 90, Narrowboat Fit Out - painting and fitting the ceiling
How far can you move a Narrowboat in 3 days? | Flow with Mylo
94. Narrowboat shower enclosure takes shape
VLOG 92, Narrowboat Fit Out - Insulating the hatch doors
VLOG 102, Narrowboat Fit Out, 12v Fridge, Isolation Transformer and Solar Electrics part 3
Living on a Narrowboat and saving space with a sliding door!!!
Vlog 32, Narrowboat Fit Out - The shower enclosure
Building Our Narrowboat #47 - Moving in and Cooking on Gas.
Did we go all the way by Narrowboat?
VLOG 117, Narrowboat Fit Out - STERN HATCH AND DOOR