VLOG 90, Narrowboat Fit Out - painting and fitting the ceiling
VLOG 89, Narrowboat fit out = PAINTING THE STERN, TILLER & GUNWALE
VLOG 91, Narrowboat Fit Out - New engine bed
VLOG 71, Narrowboat Fit Out - BIG CUPBOARDS for the Electrics, Coats and Stuff
VLOG 57, Narrowboat Fit Out - CLADDING THE BEDROOM CEILING
Vlog 82, Narrowboat Fit Out - Tiling the Galley
VLOG 95, Narrowboat Fit Out - Fuel lines, Hoses and Cables on Canaline 42 Engine - PART 3
VLOG 43, Narrowboat fit out - A BIT MORE OF THE BATHROOM VANITY UNIT
VLOG 42, NARROWBOAT FIT OUT - Wash hand basin base unit Frame and a bit more plumbing
VLOG 79, Narrowboat Fit Out - Bookcase and A day out on the River Soar
VLOG 87, Narrowboat Fit Out - Painting the Bow
VLOG 70, Narrowboat Fit Out - Galley (Kitchen) part 5 and a ride on a Steam Train
VLOG 96, Narrowboat Fit Out - HATCH FRAMES
VLOG 86, Narrowboat Fit Out - Bilge pump pipework and finish painting cabin sides
VLOG 100, Narrowboat Fit Out - Second Fix Electrics part 1
VLOG 101, Narrowboat Fit Out - Inverter, Travel Pack and a lot more wiring PART 3
Narrowboat Sunrise - inspired by nature - Upper Peak Forest Canal VLOG 71
Vlog 80, Narrowboat Fit Out - ANTI-SLIPPING THE ROOF AND DRILLING MORE HOLES
VLOG 94, Narrowboat fit out - Exhaust, Fittings and Pipe prep on Canaline 42 Engine
VLOG 18, NARROWBOAT FIT OUT - PART 4. BASE PLATE TO SUB FLOOR