Building the V-Bottom Skiff - Episode 41: Sea trials
Building the 23' V-Bottom Skiff - Episode 1 - Side planking
Building the 23' V-Bottom Skiff - Episode 11: Bottom planking
Building the 23' V-Bottom Skiff - Episode 2: Building the Transom
Building the V-Bottom Skiff - Episode 24: Laminating the Cutwater
The V Bottom Skiff Ships Off
Building the 23' V-Bottom Skiff - Episode 9: The Keel
V-Bottom Skiff Refinishing
Building the 23’ V-Bottom Skiff - Episode 21: Side planking
Building the 23' V-Bottom Skiff - Episode 7: Laying down the sole
Building the V-Bottom Skiff: Episode 29 - Laminating our knees with epoxy
Building the V-Bottom Skiff - Episode 32: Installing the inwhales
Building the 23' V-Bottom Skiff - Episode 8 - Installing the keelson
Building the 23' V-Bottom Skiff - Episode 3: Building the stem and molds
Building the V-Bottom Skiff - Episode 40: Painting up the topside, bottom and out the open door!
Building the 23' V-Bottom Skiff - Episode 14: Second layer of bottom planking
Building the V-Bottom Skiff: Episode 35 - Scarfing the caps with a ship-saw and rabbit plane
Building the 23' V-Bottom Skiff - Episode 13: First layer of fiberglass
Building the 23’ V-Bottom Skiff - Episode 22: Cutting the sheer line
Building the 23' V-Bottom Skiff - Episode 5: Installing the chines