Renovation begins on a 1973 Egg Harbor Sportfish boat - Boat Restoration EP001
Cockpit Deck Framing project begins on a 1973 Egg Harbor boat - Boat Restoration EP035 Jan-Apr 2019
Fabricating engine hatches and drain channels for a 1973 Egg Harbor boat - Boat Restoration EP055
Two Cockpit Deck Beams are installed in the 1973 Egg Harbor Sportfish - Boat Restoration EP044
1973 Egg Harbor - Boat Restoration EP050 - Cockpit Center Deck Frame Assembly
Fitting & Installing Cockpit Deck Framing in the 1973 Egg Harbor Sportfish - Boat Restoration EP043
Replacing a Bulkhead - Boat Restoration EP007 (2013 Part 2)
Aft cockpit hatches progress to the point of fitting nicely at the boat - Boat Restoration EP053
Fabricating and Installing a new Door Sill - Boat Restoration EP062
Goodbye Flybridge - Boat Restoration EP010 (2014 Part 1)
Fabricating and Installing new Cockpit Cover Boards - Boat Restoration EP023 (2017 Part 2)
Demolition of some rotted Transom Plywood. Muffler removal - Boat Restoration EP037
Bulkhead, Sheer Clamps & Rubrails - Boat Restoration EP004 (2012 Part 3)
The Cockpit side panels are finished to a point where we can move on - Boat Restoration EP068
Cockpit Deck Curbing Final Installation & Removing the Old Engine Mounts - Boat Restoration EP061
Cockpit Deck Framing - Mahogany Center Frame Assembly - Boat Restoration EP036
V-Berth Cabinet Installation & Cockpit Decking Removal - Boat Restoration EP029 (2018 Part 4)
Flybridge Renovation: Fabricating and Installing More Pieces - Boat Restoration EP013 (2014 Part 4)
Installing Mahogany Base Trim & Tabbing in the Knees - Egg Harbor Sportfish Boat Restoration EP072
Cockpit Deck Project: Edging (Curb) fit & Installation (Part 1) - Boat Restoration EP060