Esper Refit 22 - Waldringfield Boatyard Special; decks complete
Esper Refit 21 - Awlcraft Top Coat
Esper Refit 09 - Awlgrip 545; Redesigning Cabin; Polyurethaning The Veneer
Esper Refit 14 - Faring Complete; 545 Awlgrip; Wilson Art Laminates
Esper Refit 50-52 - One year in! Portabote improvements; squid fishing
Esper Refit 34 - bedding deck fittings with butyl tape, polishing stainless,
Esper Refit 02a - Removing The Main And Mizzen Mast From An Oyster 435 In Thailand
Esper Refit 32 - invisible stainless welds; how to plug deck fittings
Esper Refit 15 - polyurethane veneer; honeycomb boxes
Esper Refit 01 - introduction to our extensive yacht refit
Esper Refit 03 - time lapse; removing veneer, toe rail; mast paint
Esper Refit 31 - swim platform; shaft crevice corrosion
Esper Refit 17 - Stainless work; faring deck; preparing hull
Esper Refit 53-55 - launch day - drone footage; Dripless seal issues
Esper Refit 02 - mast removal; rewiring plans; stripping engine
Esper Refit 41-42 - welding rodents; Rocna bow roller
Esper Refit 03a - Six Days Work In A Boatyard In Three Minutes
Esper Refit 20 - West System microlite; Osmosis prep; teak toe rail; 8mm laminate
Walk Through Esper Refit - Oyster435
Esper Refit 08 - Holes In Deck; Galley Is Tomato And Aluminium