Bulkhead, Sheer Clamps & Rubrails - Boat Restoration EP004 (2012 Part 3)
CLC Kit Screw up! Planing sheer Clamps- Installing Deck Beams- Chesapeake 18 Episode 7
S2E41 Water Tight Bulkhead || Bulkhead #5 is fitted || Wave Rover 650
Core Sound 15 Build Part 11
Sheer Clamp Success - Haven 12 1/2 - Episode 58
S2E34 How to Build a Bulkhead in 3 easy Steps || Wave Rover 650
Haven 12 1/2 - Coamings Part 2 - Episode 68
Episode 14 Cutting and installing a Sheer clamp
Watertight bulkhead for solo circumnavigation. Episode 5.
International 2.4mR Sailboat Project - Episode 30 - Installing the bulkheads
TRAINING | PERI MAXIMO assembly of stopend formwork (EN)
Steaming the Sheer Clamp - Haven 12 1/2 - Episode 57
Haven 12 1/2- Sheer Clamps Part 1 Episode 56
(S-1 Ep-34) 18' Sailboat Build (Chines, Sheer Clamps, Etc) Part 9
Turn with Ease: Installing an Electric Power Assist System - Electric Power Steering
Building a Wooden Sailboat #12: Chain Plates, Bulkheads, & Interior Paint
14thWeek
S2E62 Cabin Camber is Wrong and must be Corrected
Haven 12 1/2 - Spiling the Bulkhead - Episode 67
Replacing a Bulkhead - Boat Restoration EP007 (2013 Part 2)